# Landscape Design & Installation Proposal

**[Company Name]** — Licensed Landscape Contractor
**License #:** [State Number] | **Insured:** General Liability $[X]M, Workers' Comp Policy #[Number]
**Certifications:** ICPI (paver installer), NCMA (segmental wall), ASCA (asphalt)

---

**Date:** _______________ | **Proposal #:** LD-[YYYY-MM-NNN] | **Valid for:** 30 days

## 1. Property Information

**Owner:** _______________________________ **Phone:** _______________ **Email:** _______________
**Property address:** _______________________________________
**Property size:** _____ sq ft total / _____ sq ft to be landscaped
**HOA restrictions:** ☐ None  ☐ Apply — board approval required first

## 2. Site Conditions Assessment

**Soil type:** ☐ Clay  ☐ Loam  ☐ Sandy  ☐ Rocky (testing recommended for major plantings)
**Drainage:** ☐ Good  ☐ Poor (regrading or French drains may be needed)
**Existing vegetation:** ☐ To preserve  ☐ To remove  ☐ Some of each
**Underground utilities:** Customer to call 811 (free) at least 3 business days before excavation
**Sun exposure:** Full sun _____ hrs | Part shade _____ hrs | Deep shade _____ hrs

## 3. Scope of Work

### Design Phase
- [ ] Site survey and measurements
- [ ] Concept drawings (2-3 design options)
- [ ] Plant list with specifications (botanical names, sizes, quantities)
- [ ] Final approved design package (used for permitting if needed)

### Hardscape Installation

**Patios / walkways:**
- [ ] Material: ☐ Concrete pavers (Belgard, Pavestone)  ☐ Natural stone  ☐ Stamped concrete
- [ ] Pattern: _______________
- [ ] Total area: _____ sq ft
- [ ] Edge restraint: ☐ Plastic  ☐ Aluminum  ☐ Concrete curb
- [ ] Polymeric sand joints (sand stays put, resists weeds)

**Retaining walls:**
- [ ] Wall block: ☐ Allan Block  ☐ Versa-Lok  ☐ Belgard Anchor
- [ ] Height: _____ feet (over 4 ft requires engineer stamp in most jurisdictions)
- [ ] Drainage: gravel + drain pipe behind wall (we always include this)
- [ ] Geogrid reinforcement: ☐ Required (over 4 ft)  ☐ Not required

**Drainage:**
- [ ] French drain installation: _____ LF
- [ ] Catch basins / area drains
- [ ] Downspout extensions tied to drainage system
- [ ] Dry well / infiltration trench

### Softscape Installation

**Lawn:**
- [ ] Tear-out existing turf: _____ sq ft
- [ ] Soil amendment (compost, topsoil): _____ cubic yards
- [ ] New lawn: ☐ Sod  ☐ Hydroseed  ☐ Seed (note: seeding requires 4-8 weeks until usable)
- [ ] Sod type: ☐ Bermuda  ☐ Zoysia  ☐ St. Augustine  ☐ Fescue  ☐ Bluegrass

**Planting beds:**
- [ ] Bed preparation (tilling, amendment, edging)
- [ ] Trees: _____ qty, sizes _____
- [ ] Shrubs: _____ qty
- [ ] Perennials: _____ qty
- [ ] Annual color: ☐ Spring  ☐ Summer  ☐ Fall  ☐ Year-round contract option
- [ ] Mulch: 3" depth installed | Type: ☐ Hardwood  ☐ Pine  ☐ Cedar  ☐ Rubber

### Irrigation
- [ ] Drip irrigation for planted beds (water-efficient)
- [ ] Rotary heads for turf zones
- [ ] Smart controller (Rachio, Hunter Hydrawise — WaterSense certified)
- [ ] Rain sensor / weather adjustment

### Lighting (optional add-on)
- [ ] LED path lights: _____ qty
- [ ] Up-lighting on trees / features: _____ qty
- [ ] Transformer + timer
- [ ] All low-voltage (12V)

## 4. Plant Specifications

We use only plants from these suppliers (Quality Grade #1 or Premium):
- [ ] Trees: ANSI Z60.1 nursery stock
- [ ] B&B (balled & burlapped) for trees over 6 ft
- [ ] Container-grown shrubs in #3 to #15 containers
- [ ] All plants inspected at delivery; rejected plants returned at supplier's cost

**Native plant preference:** Where appropriate, we recommend native species for lower water/maintenance needs. List provided with proposal.

## 5. Pricing

| Phase | Description | Cost |
|---|---|---|
| Design | Plans + 2 revisions | $_____ |
| Site prep | Demo, grading, soil amendment | $_____ |
| Hardscape | Patios, walls, walkways | $_____ |
| Drainage | French drains, basins | $_____ |
| Softscape | Trees, shrubs, perennials, mulch | $_____ |
| Lawn | Sod or seed installation | $_____ |
| Irrigation | System install + controller | $_____ |
| Lighting | Low-voltage system (if selected) | $_____ |
| **Subtotal** | | **$_____** |
| Sales tax | | $_____ |
| **TOTAL** | | **$_____** |

## 6. Timeline

**Design phase:** _____ weeks
**Installation start:** Within _____ weeks of design approval
**Installation duration:** _____ business days (weather permitting)
**Best installation seasons:** Spring (Mar-May) and Fall (Sep-Nov) — summer extreme heat affects plant establishment

## 7. Plant Warranty

**1-year plant warranty** applies to:
- Trees and shrubs we install
- Plants properly maintained per our care instructions
- Plants given adequate water per irrigation schedule

**Excluded from plant warranty:**
- Damage from improper customer maintenance (over/under watering)
- Weather extremes (hard freezes, drought, hail)
- Animal damage (deer, rabbit, vole)
- Construction damage by other trades

**Workmanship warranty:** 1 year on installation work
**Hardscape warranty:** 5 years on paver/wall installation (settlement caused by improper base prep)

## 8. Customer Responsibilities

After installation, customer agrees to:
- Water new plants per provided schedule (we'll calibrate irrigation, but customer monitors)
- Avoid herbicide application near new plantings for 90 days
- Reapply mulch annually
- Not allow construction traffic on lawn for 30 days

## 9. Payment Schedule

- 30% deposit on signed contract (covers design + materials ordering)
- 40% at start of installation
- 30% on substantial completion

**Accepted payment:** Check, ACH, credit card (+3% surcharge)
**Financing available** through [Provider name] for projects over $10,000

## 10. Signatures

**Customer:**
Signature: _________________________ Date: __________

**Landscape Contractor:**
Signature: _________________________ Date: __________
License #: _________________________

---

*Recurring maintenance plans available starting at $_____/visit. See maintenance contract for details.*
